Land acquisition for Road Development Projects which also includes;

  • Consultancy services for a study to determine the cost of acquiring the right of way and relocating of services for the improvement of trunk roads in Kampala (Bakuli Natete Road) 2002-2003-Property valuation report with Ministry of Works and Transport
  • Consultancy services for a study to determine the cost of acquiring the right of way and relocating of services for the improvement of trunk roads in Kampala .Preparation of Land acquisition report (Nsambya Gaba Road) 2002-2003
  • Survey and valuation of Land and Developments falling within the Road reserve of Kafu Masindi Road length of Road 44 km (2003-2004)
  • Feasibility study and detailed engineering design for upgrading to Bituminous standards Soroti Dokolo Lira Roads. Property valuation Report, length of project road 125km (2004-2005)
  • Consultancy services for the implementation of Physical Road safety improvements at identified black spots-Kampala Jinja Kampala Entebbe Road-Property Survey and Valuation Report-2005
  • Consultancy services for expropriation of land for the road reserve for the Northern corridor route (Masaka Mbarara Section 148.8km and Masaka Kyotera section 5.5km)2006-2008 under Road Agency Formation Unit (RAFU)UNRA
  • Kabale-Kisoro Bunagana / Kyanika Road upgrading project. Survey and valuation of Land and Developments falling within the Road reserve of 98.7km-Valuation Report (2007  and ongoing)

 